Skip to content

Featured project · 2026

Renewed flooring for the Overbury site office at LEGO London.

David Catton helped coordinate approximately 750m² of renewed carpet tile for the project, working with Overbury and Loughton Contracts.

Palletised renewed carpet tiles being unloaded for the Overbury site office project at LEGO London
Year2026
QuantityApproximately 750m²
ProjectOverbury site office, LEGO London
CollaborationOverbury and Loughton Contracts

Planning

Flooring aligned with the project areas.

The project brought together several renewed carpet tile products across the planned office, meeting and shared spaces.

David’s role was to help coordinate the practical route from selected flooring to prepared, palletised products ready for delivery.

Annotated floor plan showing flooring areas for the Overbury site office at LEGO London
Renewed carpet tiles wrapped and secured on a pallet
Palletised renewed carpet tiles being unloaded from a delivery vehicle

Preparation and delivery

Prepared to move as a project-ready quantity.

The selected flooring was assembled into securely wrapped pallet loads and delivered for use in the Overbury site office.

The photographs show the physical preparation and delivery behind the project.

Selected flooring

Different products for different areas.

The project used a coordinated selection of renewed carpet tile finishes across the planned spaces.

Green tonal carpet tile selected for the project
Dark grey linear carpet tile selected for the project
Light grey linear carpet tile selected for the project

The result

Experience carried through into delivery.

Approximately 750m² of renewed carpet tile was supplied for a live London project. The work joined product selection, area planning, preparation and logistics into one coordinated route.

Bring experience into your next project.

Whether flooring is coming out, going into a new scheme or both, speak to Renuvo early and we will help establish the right route.